Spray Foam Insulation

Spray Foam Insulation

Spray Foam Equipment

patient

Spray Foam Roofing

map
Share |

Toubleshooting for 2 Component Foam

Refillable Foam Systems
for the Residential / Commercial Building Industry

The Touch ‘n Seal Refill System is a two-component, class I fire-retardant, spray polyurethane insulating foam system for large volume users. At 1.75 pcf and 7.12 R-value, Touch ‘n Seal 17 gallon, refillable foam systems offer structural strengthening with exceptional thermal insulation value and sound reduction. Ideal for full building insulation and air barrier sealing. Returns are simplified with prepaid freight and easy pick-up when you’ve emptied the units.

  • Economical, lower cost per board foot than other insulation systems
  • Air seals and provides thermal and sound insulation
  • No external power supply required
  • Ideal for full cavity fills or “flash & batt” applications
Shelf Life: 12 months in unopened canisters
Yield (theoretical): 2000 + board feet / 170 + cubic feet
Meets ASTM E-84, Class 1, flame spread 25, smoke developed 450
Cure time: 1 minute
Not for use as a fire stop

ITEM # DESCRIPTION PACK/FILL
4505100000 RF17-1.75 PCF Refillable (A & B Chemical Tanks Only) 1
4505100012 Foam Applicator w/ 12” Hoses 1
4505100035 Foam Applicator w/ 60’ Hose Kit 1
4505100045 Hose Set – 30’ – Refillable 1 – 30’ set
4505100045 Hose Set – 150’ – Refillable 1 – 150’ set
4505100025 Filter Assembly – Refillable 2
4505100040 On/Off Valve – Tank to Hose 2
4505100050 On/Off Valve – Hose to Applicator 2
4505100055 Hose Set – Nitrogen Refillable 2
4505100060 Heater Bands w/ Controls Refill 1 set
4505100065 Regulator - Nitrogen 1
4505100080 Nozzle Kit – Calibration 25/pack
4004529930 Nozzle Kit, Clear - Conical Spray 25/pack
4004529940 Nozzle Kit, Yellow - Fan Spray 25/pack
Video

Assembly and Use

Literature

Residential Commercial Data Sheet Quick Start Guide (English) Quick Start Guide (Spanish) Calibration Procedure Maintaining Optimal Chemical Temperature Open Flame & Welding Safety Pressure Balancing Procedure Shut Down & Return Procedure MSDS Component A Component B Technical Specifications Times, Temperatures and Yields